Waste Management’s Landill Name
Methane Use/Control
Beneicial Use
Status
methane gas recovery 1 1. 1
Lake View Landill
851 Robinson Road East Electricity
Production of 6.1 MW of electricity sold to Constellation New Energy.
Active
facilities, established at more than 100 landfills 12
Erie, PA 16509
Direct Use
Planned Production of 4.8 MW electricity, Air Permits Issued, Engines 23. Arden Landill OOTPRINTING
pany, Waste Management recognizes m
around the country, to be sold to power company
(Penn Power).
Delivered, Operation will Commence in 2009
Arden Station Road
Washington, PA 15301
enhouse gas emission, and help our e
generate enough energy to power 400,000 homes 13
11 ment and industry in this effort.
and save more than
Direct Use
High BTU production (1.2 mmscfd) delivered into Equitable Gas Company’s natural gas pipeline.
Active
6 34.
Monroeville Landill 37 600 Thomas Street
4 15 Monroeville, PA 15146
es and seven Canadian provinces have mate Registry (TCR) to develop a uniform
two million tons of coal each year. Pennsylvania Direct Use
High BTU production (1.2 mmscfd) Active
5 14 1628 45.
Valley Landill
quirements for voluntary GHG emissions serves on TCR’s stakeholder advisory
contributes significantly delivered into Equitrans natural gas pipeline.
6015 Pleasant Valley Road Irwin, PA 15642
9 10
are considering whether to join the TCR to determine what requirements USEPA
to this total, with 16 gas- to-energy facilities and Planned Direct Use
High BTU Production delivered into Equitrans natural gas pipeline.
Estimated Startup July 2009
WASTE MANAGEMENT OF PENNSYLVANIA INC.
65. South Hills Landill 3100 Hill Road a federal mandatory reporting program.
two resource recovery CURRENT AND FUTURE ESTIMATED LFGTE PROJECT ANNUAL BENEFITS (ENERGY/ENVIROMENTAL)1
Library, PA 15129
plants currently in operation, and more
NSPS Capture and Control
Waiting for Suficient Gas Production
Power Plant Renewable
Sub-Total:
68. Evergreen Landill
Rt. 119N & Lusciousboro Road
in the planning and Direct Use
High BTU production, blended into natural Active
Electricity Generation2:
71 MW
• 3.05 million metric tons of CO2 • 146,436 tons of methane
Coral, PA 15731
97. Laurel Highlands
development phase.
gas pipeline.
Energy Beneit:
Powering 45,147 homes • 388,570 tons of CO2 /year
260 Laurel Ridge Road Johnstown, PA 15909
Direct Use
High BTU production, blended into natural Active as of 11/17/2007
Environmental Beneits:
Equivalent to:
• Removing emissions equivalent to
8 Southern Alleghenies
SUMMARY
gas pipeline.
a. Direct Reduction of Methane from
Landill: 141,436 tons of methane 843 Miller Picking Road Davidsville, PA 15928
• 558,066 passenger vehicles
Carbon sequestered by 692,510
(16 Projects at 19 MSW Landills)
• 4 Current power plants (Grand
Direct Use
High BTU production, blended into natural gas pipeline.
Active as of 9/10/2007
or 2.7 million metric tons of CO2 Equivalents/year
9 Shade Landill 1176 No. 1 Road
• acres of forest
Offsetting the use of 15,911 railcars
Central, Lake View, Pottstown,
b. Avoided Equivalent Emissions Reduced (offset of carbon dioxide from avoiding Cairnbrook, PA 15924
•
of coal
Avoiding use of 345,861,859 gallons
Mountain View)
• 1 Power plant to commence
Electricity
LFG blended with petroleum-based liquid fuel for production of 14 MW of electricity by INGENCO.
Active
use of fossil fuels). 388,570 tons of
CO2 /year or 0.35 million metric tons of 10 Mountain View Reclamation 9446 Letzburg Road Greencastle, PA 17225
of gasoline
operation in 2009 (Arden)
Direct Use and Electricity
Medium BTU Project commenced, for Project Commenced in 2008
CO2 Equivalents/year
11 Pine Grove Landill
• 1 Power plant recently applied for
(GROWS North)
production of electricity (INGENCO) and for direct use by local industry PLUS
RD# 4, Box 447 Schultz Road
• 1 Current Medium BTU pipeline
(Tullytown, GROWS)
NSPS Capture and Control; Planned (Guilford Mills).
Finalization of Renewable project expected Project being inalized
High BTU Projects3:
10,666 scfm
Pine Grove, PA 17963
12 Alliance Landill
Sub-Total:
• 1.26 million metric tons of CO2
• 1 Medium BTU pipeline (and
Direct Use and Electricity
in near future.
Energy Beneit:
398 South Keyser Avenue Taylor, PA 18517
• 59,284 tons of methane
• 146,603 tons of CO2 /year
Peaking Power Plant) commenced in
2008 (Pine Grove)
Electricity
Production of 9.9 MW of electricity by Active
Heating 34,735 homes
13 Grand Central Sanitary
Equivalent to:
• 1 Pipeline project being inalized
Green Knight Econ. Development Corp.
Environmental Beneits:
a. Direct Reduction of Methane from 910 W. Pennsylvania Avenue Pen Argyl, PA 18072
• Removing emissions equivalent to 231,214 vehicles
(Alliance)
• 5 Active High BTU processing plants
Electricity
PErxoedlounctPionwoefr 6Te.0amMWComofpealenyc.tricity sold to
Active
Landill: 59,284 tons of methane or 1.1294 million metric tons of CO2 14 P1o4t2ts5toSwenllLRaonaddill • Carbon Sequestration by 286,916 acres of forest
(Monroeville, Valley, Laurel, Shade,
Southern Alleghenies)
Equivalents/year
b. Avoided Equivalent Emissions Reduced Pottstown, PA 19464
• Offsetting the use of 2,935,881 barrels of oil
• 1 Pending High BTU processing
Electricity: Medium BTU LFG sale and Solar
Medium BTU LFG sold through pipeline
to Exelon. Production of 13 MW/hr of electricity through Exelon gas turbines and Active
(offset of carbon dioxide from avoiding use of fossil fuels). 146,603 tons of
15 GROWS Landill
1513 Bordentown Road • Avoiding use of 143,294,986 gallons of gasoline
Waste Management of Pennsylvania
plant (South Hills)
• Leasing for one solar project
steam turbines; EPuron Lease for 3 MW Solar Panel Project.
CO2 /year or 0.1330 million metric tons of CO2 Equivalents/year
Morrisville, PA 19067
Green Energy Projects 2009
(GROWS – Epuron)
At GROWS North, we have applied for a 1 Based on EPA Calculation Tool at http://www.epa.gov/lmop/res/lfge_beneitscalc.xls
• Other investigations and R&D work continuing
5 turbine renewable energy power plant, approximately 16.5 MW.
2 Power Plants include Lakeview (6.1 MW), Arden (4.8 MW PLANNED), Ingenco (14 MW), Green Knights Economic
Development Corporation (9.9 MW), Pottstown (6.0 MW), GROWS (13 MW) and TRRF (18 MW). This does not include Alliance nor Evergreen, which are in investigation/planning stages, or GROWS North Renewable Energy,
Electricity: Medium BTU LFG sale
Medium BTU LFG sold through pipeline
to Exelon. Production of 18 MW/hr of Active
169. Tullytown (TRRF) Landill 200 Bordentown Road which is in air permit application phase. Note that total potential power for Exelon is 60 megawatts plus (not including Pennsbury Power plant’s two 3.3 megawatt turbines).
3
electricity through Exelon gas turbines and steam turbines.
Tullytown, PA 19007
Assumptions re 5/6 High BTU projects: Laurel, Shade, Southern Allegheny, Monroeville, Valley and South Hills equals or will equal 9166 cfm. Also treats Pine Grove project, which will beneicially use 1500 to 2000 cfm in peaking plant and medium BTU pipeline applications, as a medium BTU project at 1500 cfm.